Skip to content
(814) 893-5701
MENU
Search
Close this search box.

Wastewater Treatment Project at Power Facility

Highland Tank in Stoystown recently shipped a 550 gallon HTC-G-TF singlewall oil/water separator and two 40,000 gallon HTC-G singlewall oil/water separators to a power transformer repair facility. The tanks will assist this facility with a permanent solution to their stormwater management. Read more.

Back To Top